|
Twister April 10th 2008
April 10, 2008Published by universeLarge rebuild of Twister section started.
Started rebuilding a section of the trail that has several features that are falling apart. The large log ride has shifted over the years rendering some things useless. This was the first of many things to get some royal treatment. The old dimensional lumber was tired and slippery. Should be a nice section once finished. |
